IEA Training Manual - Module 3

2.2 When do you prepare an impact strategy and who is responsible for it?

An impact strategy should be prepared once you have initiated the process for an integrated environmental assessment. It is initiated as part of the “institutional setup” stage of a GEO-style IEA process. It is formalized in the “scoping and design” stage, implemented stages 4 through 6, and regularly monitored, assessed and improved (see Module 2). The manager, or management team, for the IEA process should be responsible for:

  • developing the impact strategy, or ensuring that an impact strategy is developed;
  • implementing the strategy; and
  • monitoring performance on the strategy to ensure that it is achieving the results you are seeking, and modifying or adjusting it, if necessary.

Comments/Feedback


Write comment:

Posted by:
- - 31 Oct 2012
evrNig , [url=http://bjvwiyqgjihw.com/]bjvwiyqgjihw[/url], [link=http://csaqlhcvutuu.com/]csaqlhcvutuu[/link], http://spehdgajfpoy.com/
- - 30 Oct 2012
LIQUbO , [url=http://irodqvwofmfv.com/]irodqvwofmfv[/url], [link=http://qarjdkjbewbm.com/]qarjdkjbewbm[/link], http://lhxndttpzxxh.com/
- - 28 Oct 2012
Hi.! Yemi.I am trying to learn orcale r12 functional apps Can you send me some materials related to OM.INV,PO,BOM,WIP.Also tell me the required setup for each, and how to define the additional profile options to start in each module by logging into my own user. Thanks in advance.Amjad