Redirecting to www.unep.org/nigeria

Post-Crisis Environmental Assessments and Recovery Methodologies

Afghanistan Post-Conflict Environment Assessment Post-Crisis Environmental Assessment 2003

Ground Contamination Assessment Report - Millitary Waste Storage Site, Astana, Afghanistan

Technical Assessment 2006
Sudan Post-Conflict Environmental Assessment Post-Conflict Environmental Assessment 2007
Depleted Uranium in Bosnia and Herzegovina - Post-Conflict Environmental Assessment

Post-Conflict Environmental Assessment

2003
UNEP Final Report: Depleted Uranium in Serbia and Montenegro - Post-Conflict Environmental Assessment in the Federal Republic of Yugoslavia Post-Conflict Environmental Assessment  2002
UNEP Final Report: Depleted Uranium in Kosovo - Post-Conflict Environmental Assessment Post-Conflict Environmental Assessment  2001
Assessment of Environmental "Hot Spots" in Iraq Assessment 2005 
UNEP in Iraq- Post-Conflict Environmental Assessment, Clean Up and Reconstruction Post-Conflict Environmental Assessment 2007
UNEP Final Report - The Kosovo Conflict: Consequences for the Environment and Human Settlements Assessment 1999 
Lebanon Post-Conflict Environmental Assessment Assessment 2007
Assessment of the Management of Solid Wastes in Liberia Assessment 2007
Assessment of the Legal,Scientific and Institutional Frameworks for biodiversity protection in the Republic of Liberia Assessment 2007
 Maldives Post-Tsunami Environmental Assessment Assessment  
UNEP Final Report: Strategic Environmental Assessment - FYR of Macedonia Assessment 2001
UNEP Final Report: Post-Conflict Environmental Assessment - FYR of Macedonia Post-Conflict Environmental Assessment 2000
UNEP Final Report: Post-Conflict Environmental Assessment Albania Post-Conflict Environmental Assessment 2000
Environmental Assessment of the Areas Disengaged by Israel in the Gaza Strip Assessment 2006 
 Desk Study of the Occupied Palestinian Territories Assessment 2003
Environmental Assessment of the Gaza Strip - following the escalation of hostilities in December 2008- January 2009 Post-Conflict Environmental Assessment 2009
 The State of the Environment in Somalia Assessment  
 Sri Lanka Post-Tsunami Environmental Assessment Assessment  
Oil Spill in the Kerch Strait, Ukraine Post-Disaster Needs Assessment Post-Disaster Needs Assessment 2008
Afghanistan Environment Recovery - A Post-Conflict plan for People and thier Natural Resources Recovery Plan 2006
Capacity-Building and Institutional Development Programme for Environmental Management in Afghanistan Recovery Methodology 2007
UNEP in Afghanistan - Laying the Foundations for Sustainable Development Recovery Methodology 2009 
 After Tsunami Coastal Ecosystem Restoration Recovery Methodology 2007
Environment and Reconstruction in Aceh - Two Years After The Tsunami Recovery Methodology 2007
 UNEP Post-Tsunami Recovery Activities, 2004-2007 Recovery Methodology 2008
 Iraq Institutional Capacity Assessment Report  Assessment 2006
UNEP Post-Conflict Capacity-Building Programme in Liberia Recovery Methodology 2007
UNEP Final Report: From Conflict to Sustainable Development,Assessment and Clean-up in Serbia and Montenegro Assessment  2004
Environmental Needs Assessment in Post-Disaster Situations Assessment 2008
Intergrating Environment in Post-Conflict Needs Assessment Assessment 2009
Reducing Risk through Environment in Recovery Operations Assessment 2009
 Humanitarian Action and the Environment Assessment/Awareness 2007
 Afghanistan Wakhan Corridor Technical Report Assessment 2003
Destitution,distortion and deforestation - The impact of conflict on the timber and woodfuel trage in Darfur Assessment 2008
History of Environmental Change in the Sistan Basin Assessment 2006
Synthesis Report - Sudan Post-Conflict Environmental Assessment Assessment 2007
A Guide to Afghanistan's 2007 Environment Law Assessment/Awareness 2007
Islamic Republic of Afghanistan Assessment 2007