7.5 Site Equipment and Costs
In order to achieve the best use of land-fills,
it is necessary to have the right equipment in place. The necessary
equipment is to perform the following tasks:
levelling and preparation of the site;
creation of access roads and manoeuvring spaces;
digging and moving covering material;
initial handling and segregation of in-coming waste;
spreading and placing waste in the land-fill;
covering the waste; and,
final levelling and top-soil placement.
Invariably the equipment will be:
i) a tracked machine (such as a bull-dozer and loader)
capable of digging, lifting and carrying material;
ii) a scraper for stripping out and stock-piling material;
iii) a drag-line excavator; for preparation and winning covering material
from the site;
iv) a four wheel drive rubber tyred loaders for digging out cover and
placing it into its final position;
v) a steel wheel mobile compactor for compacting the waste in its final
place.
The budget based on these equipments
at current prices is 670,000 USD excluding labour and taxes.